Search found 7 matches

by stroudley
Wed Jul 01, 2009 5:44 am
Forum: SigScribe4 version 2 wish list
Topic: Shunt signal with specific color
Replies: 8
Views: 45622

Yellow shunt signal

The only way I could get my interlocking to do what I wanted was to use a red shunt and then to get the route to show past the signal was to pull it off for the siding road. This was only so that I could see where the route that I had set up went. It isn't really important either way I guess. The go...
by stroudley
Mon Jun 15, 2009 1:59 am
Forum: SigScribe4 version 2 wish list
Topic: Shunt signal with specific color
Replies: 8
Views: 45622

Shunt signal with headshunt

Will it be possible in the next version to incorporate the UK yellow shunt signal used as an exit signal when there is a headshunt. When I came to define my route it didn't quite turn out as expected because the shunt signal prevented the use of the headshunt. The lever diagram is correct because I ...
by stroudley
Wed Dec 01, 2004 8:20 am
Forum: SigScribe4 version 2 wish list
Topic: Signal diagram printout.
Replies: 2
Views: 24180

Signal diagram printout.

Would it be a good idea to print out the SigScribe4 signal diagram while it was being worked at the end of each session so that one didn't have to keep going to detail view to find out which signal at any location was controlled by which lever. Its not a problem with only a small frame but my design...
by stroudley
Wed Dec 01, 2004 8:13 am
Forum: SigScribe4 version 1
Topic: Single slip problem
Replies: 2
Views: 26510

Single slip problem

I am having a problem in defing a route through a single slip. The white dots stop at the slip if the route does not use the slip roads. Although I reverse another lever as part of the route this is not stored with the route defintion. Can anyone suggest what I am doing wrong. I have checked that al...
by stroudley
Sat Nov 27, 2004 8:03 am
Forum: SigScribe4 version 1
Topic: Wrong way running
Replies: 2
Views: 26330

Wrong way running

I am trying to construct the signal layout which includes a shunt signal that authorises a movement in the wrong direction onto a running line. I expected that the signal that would prevent a right way movement onto that stretch of line would be locked once I changed the shunt signal allowing a move...
by stroudley
Fri Nov 26, 2004 6:36 am
Forum: Words & Phrases
Topic: Siding
Replies: 4
Views: 36624

Siding

In GB a siding is a dead end storage road.
by stroudley
Mon Nov 08, 2004 3:02 am
Forum: SigScribe4 version 1
Topic: Tutorial help: Interlocking Points Error
Replies: 2
Views: 28423

Tutorial help: Interlocking Points Error

I have worked my way through the tutorial. But when I get to section 8 the point interlocking instructions. I find that effectively SigScribe4 locks up. Clicking the cancel bar after including FPL for lever 9 produces the message at the bottom Interlockin points lever 10 click here when complete. Cl...