Passing loops

Use this forum to report your experience of, or to ask questions about using SigScribe4 version 1.

Moderator: RedFred

Post Reply
neilch
Posts: 7
Joined: Wed Apr 07, 2010 8:01 am
Location: Norwich, Norfolk, UK

Passing loops

Post by neilch »

Ok this might not be with in the scope of this program. Is it posible to stop you pulling off the up outer home if the down outer home is pulled off?
In other words if a down train is pulling into one platform of a pasing station the up train cant pass the up outer home untill the down train has come to a stand and the down signels have been put back. I hope you can understand what I mean. I have drawn it out so I can send you my design so you can have a look.
User avatar
modadmin
Site Admin
Posts: 290
Joined: Thu Jan 15, 2004 9:41 am
Location: Australia

Post by modadmin »

You can do that using signal interlocking, selectable from the lever's pop-up menu.
All the best from "modadmin"
Forum Administration
MODRATEC
neilch
Posts: 7
Joined: Wed Apr 07, 2010 8:01 am
Location: Norwich, Norfolk, UK

Post by neilch »

Many thanks, thats working now, just got to build the layout now!!!!
Post Reply